5 most asked questions

Each project is different so before we start your project we will give you timelines for your particular project. However, for a rough guideline we generally work to 3-4 weeks from initial go ahead for basic melamine doors and laminted tops, add another 4 weeks if your getting lacqured doors, cabinets and then add an additional 2 or 3 weeks for granite or engineered stone tops. All up the process can be 6 weeks to 16 weeks depandant on what is required.

We look at the space you have and can suggest the best component for you. For small spaces or tight angles in the back of a cupboard, there are options for sliders or rotating openings. We can chat about those options.

As standard we specify and use Blum drawers and hinges. They have an amazing lifetime warranty so their products are built to last.

Installation will happen on a day that suits you. We will make arrangements with you and give you plenty of notice. The average kitchen takes a full day so we recommend you allow a minimum of day for this. We need quite a bit of space when doing the instal so if you have a spare room or undercover area, this will help us with storing the cabinents for the day of the instal. Leaving your kitchen space as free as possible will make it faster for us to instal. 

Kitchen Spectrum offers a complete range of cabinetry to suit your interior design ideas. You can have piece of mind that you will be dealing direct with the cabinetmaker and director, Baydon from the initial meet and greet, through the design process, the signoff, and then through to the manufacture and installation process. Our goal is to make sure that you love the end result and the process is as easy for you as possible.